Ski Course Design
의견: 0
Farmer John has N hills on his farm (1 <= N <= 1,000), each with an integer elevation in the range 0 .. 100. In the winter, since there is abundant snow on these hills, FJ routinely operates a ski training camp.
Unfortunately, FJ has just found out about a new tax that will be assessed on farms used as ski training camps. Upon careful reading of the law, however, he discovers that the official definition of a ski camp requires the difference between the highest and lowest hill on his property to be strictly larger than 17. Therefore, if he shortens his tallest hills and adds mass to increase the height of his shorter hills, FJ can avoid paying the tax as long as the new difference between the highest and lowest hill is at most 17.
If it costs x^2 units of money to change the height of a hill by x units, what is the minimum amount of money FJ will need to pay? FJ is only willing to change the height of each hill by an integer amount.
Line 1: The integer N.
Lines 2..1+N: Each line contains the elevation of a single hill.
The minimum amount FJ needs to pay to modify the elevations of his hills so the difference between largest and smallest is at most 17 units.
skidesign.inskidesign.out5
20
4
1
24
2118Output details: FJ keeps the hills of heights 4, 20, and 21. He raises the hill of height 1 to 4 (cost 9) and shortens the hill of height 24 to 21 (cost 9).
riseoj 작성
출처 올림피아드 > USACO > 2013-2014 > January > Bronze
평가 및 의견
Ski Course Design
아직 의견이 없습니다. 자격이 된다면 위 양식에서 가장 먼저 평가해 보세요.
풀이 제출
Ski Course Design