Milk Scheduling (Deadlines)
의견: 0
Farmer John has N cows that need to be milked (1 <= N <= 10,000), each of which takes only one unit of time to milk.
Being impatient animals, some cows will refuse to be milked if Farmer John waits too long. More specifically, cow i produces g_i gallons of milk (1 <= g_i <= 1000), but only if she is milked before a deadline at time d_i (1 <= d_i <= 10,000). Time starts at t=0, so at most x total cows can be milked prior to a deadline at time t=x.
Please help Farmer John determine the maximum amount of milk that he can obtain if he milks the cows optimally.
Line 1: The value of N.
Lines 2..1+N: Line i+1 contains the integers g_i and d_i.
The maximum number of gallons of milk Farmer John can obtain.
msched.inmsched.out4
10 3
7 5
8 1
2 125Output details: FJ milks cow 3 first (giving up cow 4), then cows 1 and 2.
riseoj 작성
출처 올림피아드 > USACO > 2013-2014 > December > Silver
평가 및 의견
Milk Scheduling (Deadlines)
아직 의견이 없습니다. 자격이 된다면 위 양식에서 가장 먼저 평가해 보세요.
풀이 제출
Milk Scheduling (Deadlines)